Switching software is hard. Moving a 1,600-ton hotel is harder.

They have more in common than you think. Guido Construction has used Kinetech software since 2012. Read about their migration to StruXure.co, with Kinetech's forward deployed engineers. Each phase lines up with the historic 1985 trip across downtown San Antonio that set a Guinness World Record, where Guido shored the bridge and set the new foundation.

The Fairmount Hotel on its dollies in 1985, with gravel-loaded dump trucks and a crane
1985. On 36 dollies, with gravel-loaded dump trucks and a crane

By the numbers

  • 1,600tons on the road in 1985: hotel, steel frame and dollies
  • 16city agencies in one planning meeting for the route
  • 2xMarket Street bridge design load, as shored, per Guido
  • Q1 2027Guido's cutover to StruXure.co
The company
San Antonio general contractor since 1927. A fourth-generation family firm; 100 years old in 2027.
The job
Move Guido's job records off Guido PM, in service since 2012, and onto StruXure.co in Q1 2027.
The crew
Guido's construction, operations, accounting and IT leads, with Kinetech Cloud professional services and the StruXure.co team.

The 1985 route: six blocks, two corners and a bridge over the River Walk

E COMMERCE STMARKET ST BOWIE ST S ALAMO ST RIVER WALK 1234 East Commerce, 1906In use until 1968, then empty First cornerBowie and Commerce Market Street bridgeShored by Guido South Alamo, 1985New foundation by Guido Schematic, street positions approximate, not to scale
Schematic, street positions approximate, not to scale

East Commerce, 1906

In use until 1968, then empty

First corner

Bowie and Commerce

Market Street bridge

Shored by Guido

South Alamo, 1985

New foundation by Guido

Guinness World Records: heaviest hotel relocated

The Fairmount Hotel crossing the shored Market Street bridge over the River Walk, 1 April 1985
1 April 1985. The hotel crosses the Market Street bridge, with the shoring visible below

Parallel tracks

What does moving a building have in common with switching to StruXure.co?

Read across each row: what the Fairmount team did in 1985, then the matching step when a contractor adopts StruXure.co.

  1. 1Discuss
    Fairmount Hotel, 1985

    Tear it down or save it? The empty 1906 hotel sat on the site planned for Rivercenter. The Conservation Society argued for five years that it was a landmark, then put $260,000 toward a move.

    Your move to StruXure.co

    Outdated software, or one price increase too many. Owners, operations and finance talk it through and decide whether to switch.

  2. 2Plan
    Fairmount Hotel, 1985

    One table, 16 agencies. After a 1981 feasibility study, Emmert's project manager met police, traffic, sewer, fire, electric and water in one meeting. Owners, architects, Guido and Emmert split the work.

    Your move to StruXure.co

    Consensus, then a roadmap. Construction managers, operations, accounting and IT agree on one plan with dates: a short Gantt chart like the one below.

  3. 3Clear the route
    Fairmount Hotel, 1985

    Close streets, shore the bridge. Streets on the route closed and the public was told when the hotel would pass. Guido crews shored the Market Street bridge around the clock for four days, in about three feet of river water.

    Your move to StruXure.co

    Tell the team, then answer four questions.

    • Accounting system, and which version?
    • Financials integrated, or separate?
    • Active jobs: finish out, or hard cut-over?
    • Usual advice: finish them out and start new jobs in StruXure.co.
  4. 4Migrate
    Fairmount Hotel, 1985

    Lift the whole building. Emmert set the hotel on three tiers of steel beams, shored each column inside, and jacked it onto 36 hydraulic dollies on 288 tires.

    Your move to StruXure.co

    All the data, or some? StruXure.co's white-glove migration moves Procore data straight into StruXure.co. For Guido, Kinetech Cloud moves the Guido PM records.

  5. 5Go live
    Fairmount Hotel, 1985

    Roll, turn, set down. From 30 March to 4 April 1985: about six blocks, two corners, over the shored bridge and back onto Guido's new foundation on South Alamo. Reopened 1986.

    Your move to StruXure.co

    Apps out, directory in, go live. Users get the StruXure.co mobile apps and the directory is imported. Hypercare follows go-live, then ongoing support.

Your roadmap to a 2027 cutover

1 Discuss
2 Plan
3 Prepare the team
4 Migrate data
5 Go live, then hypercare
Cutover, Q1 2027

Bars show order and overlap only, not durations. Light bar: hypercare, then ongoing support.

Guido Construction on StruXure.co, with Kinetech Cloud

The Fairmount Hotel on East Commerce Street, about 1910
About 1910. On East Commerce Street
The Fairmount Hotel on South Alamo Street with its 1986 addition, 2020
2020. On South Alamo, with the 1986 addition

Guido Co. on StruXure.co today

StruXure.co supports Guido jobs today across the project management suite:

  • Plan Management
  • RFIs
  • Submittals
  • Change Orders
  • PCIs
  • Daily Reports
  • Scheduling

White-glove migration, step by step

StruXure.co's program for contractors leaving Procore, announced 31 March 2026. A dedicated StruXure.co specialist guides each migration, from setting up integrations to fixing data discrepancies.

  1. Data audit
  2. Export and archive
  3. Data transformation
  4. System configuration
  5. Validation and QA
  6. Training and adoption

Kinetech Cloud, on Guido's systems since 2012

Kinetech Cloud has shipped a Guido PM release and security patches every year since 2012. For the cutover, its professional services team works with Guido and StruXure.co on the plan, the data and support after go-live. Guido Construction turns 100 in 2027.

“StruXure's forward deployed engineers make adopting StruXure easy. The system is documented, the team is experienced, and the product saves our team time and money.”

J. Sanchez, Superintendent | Guido Construction

Timeline: 100 years of Guido, and three project systems

  1. 1927Louis L. Guido sets up as a GC
  2. 1930sSan Pedro Playhouse
  3. 19811st Regenerative Architecture: Abandoned Brewery converted to SA Museum of Art
  4. 1985Fairmount Hotel move
  5. QuantumAccess, client-server
  6. 2012To Guido PM, on-premise
  7. 2013 to 2026A release and security patches every year
  8. Q1 2027To StruXure.co
San Francesco di Paola
1920s San Francesco di Paola
San Pedro Playhouse
1930s San Pedro Playhouse
Tower of the Americas, Hemisfair
1968 Hemisfair, Tower of the Americas
San Antonio Museum of Art
1981 San Antonio Museum of Art
The DoSeum
2019 The DoSeum
Congo Falls
2025 Congo Falls

Ready to start?

If you have questions or are ready to get started, contact us today to discuss how we can help turn your vision into reality.

Contact Us

Sources: Washington Post 1985; National Register 1988; Alamo Architects; Guido; Guinness; StruXure.co; Michael Guido. Photos: Guido Construction; San Antonio Express-News file photo (Market Street bridge); Institute of Texan Cultures, via the 1988 National Register nomination; Alamo Architects, also published by the San Antonio Conservation Society with permission of the San Antonio Express-News; Dror Baldinger for Alamo Architects. Migration steps: StruXure.co blog, 31 March 2026. Timeline photos: Darrylpearson, CC BY-SA 4.0 (San Francesco di Paola); Guido Construction (San Pedro Playhouse, The DoSeum); Nv8200pa, CC BY 4.0 (Tower of the Americas); Nan Palmero, CC BY 2.0 (San Antonio Museum of Art); PGAV Destinations (Congo Falls).